CREATIVITY CHANGES YOUR LIFE

Tel: +86 0755-84870739

Email: info@nexhc.com

Home  >  News  >  Optimization dedicated

News

Company news | Industry news | Exhibitions and events | Optimization dedicated | aromatherapy diffuser |

Installation and maintenance of ultrasonic industrial humidifier.water humidifier Processor

source:Optimization dedicated    release time:2022-10-13    Hits:     Popular:aromatherapy diffuser direct sales

  J17 Air Humidifier

  1. Equipment installation and location selection

  The installation location of the device can be selected based on the following factors:

  (1) The maximum relative humidity of the required humidification environment. When the maximum relative humidity is higher than 75%RH in the required humidification environment, the humidification device should be installed outside the required humidification environment. When the maximum relative humidity is lower than 75%RH, the humidifier can be installed in the humidified environment.

  (2) Requirements for explosion-proof humidified environment; The required humidification site has explosion-proof requirements, and the humidification equipment should be installed in a non-explosion-proof area outside the required humidification environment.

  (3) If the Celsius temperature in the required humidification environment is lower than zero, the equipment should be installed in the place where the Celsius temperature is higher than zero outside the required humidification environment.

  (4) If there is more floating dust in the required humidification environment, which may cause the air intake of the equipment to work poorly, the equipment should be installed outside the required humidification environment.

  According to the above conditions determine the installation position, equipment installation height should also be considered, under normal circumstances, the equipment out of the fog port should be set on top of the humidifying places, less than 50 cm away from the top, and should, as far as possible to reduce the vertical distance out of the fog port to the device, in order to maximize the aerosol transmission efficiency, therefore, atomized humidifying equipment installation should be considered as far as possible in high.

  Selected after the equipment installation site and the installation height, according to the specific situation of humidifying area connection out of the fog line: first of all, if within the humidifying places, have a high speed air source, such as all kinds of high speed blower, all kinds of gas injection port, etc., out of the fog line port at this time should be set in the lower part of the air source, exports to the above, by using high speed air flow diffusion source uniform gasification; If the air flow is relatively static in the humidification place, it is necessary to consider lengthening the connection of the fog pipe in the humidification place, uniform distribution of the fog port, the fog branch port upward and horizontal 30 degrees Angle, so that the natural floating gasification of the humidified water fog.

  2. Precautions in equipment installation

  The device should be installed horizontally. External PVC pipe fittings should be sealed to prevent air leakage and water leakage. If the external water supply pressure is insufficient, connect a pressurized water pump to ensure that the water supply pressure is greater than 1kg /cm3. The connection between the water inlet port of the device and the water supply pipe must be connected by a hose with lock females on both sides. The lock females of the connection hose have sealing rings, so there is no need to wrap the connecting wire around the wire to prevent water leakage. When connecting multiple DEVICES on a water supply line, the water supply branch of EACH device must be connected with a water supply cut-off door for easy maintenance in the future. Before installing a new water supply pipe, drain a certain amount of water to clean the pipe. This prevents impurities in the new pipe from blocking the water inlet solenoid valve and causing water supply faults.

  After the equipment is installed stably, the fogging pipe of the equipment can be sealed and connected according to the direction of the pre-designed pipe. When connecting, attention should be paid to: a flange connecting plate is set up near the equipment, or a hose is connected, so that the maintenance of the equipment is convenient in the future; The lowest point of the fog outlet should be higher than 1/3 of the pipe diameter, so as to ensure that all the water in the transmission pipe flows back into the device and the pipe is smooth. In order to make the humidification space evenly distributed, the pipeline can be connected with several fog outlets according to the actual situation, and the diameter of the fog outlet can be selected according to the actual situation. Do not make U-shaped pipe connections because such connections may cause dews and blockage, affecting the normal operation of the device.


Read recommendations:

A4 Aroma Diffuser

TS07

Origin of fragrance.aromatherapy diffuser manufacturer

essential oil diffuser Production

Air purifier wholesale

Latest news

Hot

Inquiries

Contact the following for inquiries regarding our services and products.

Inquiry form